would wish to have your opinion as to whether you would he content with the hole being finished or lined with 10'1 pipe in that portion of the hole that might be drilled below the bottom of the 12" pipe before entering into a contract with you, if our proposal is accepted* With reference to requirement # (8), in regard to the 48 X hour production test, no mention is made as to in just what manner you might wish to make this test and if a contract should be entered into the requirements should be clear as to how this test is to be made* .deferring to Requirement # (10), our workmen are protected through the .Nevada Industrial Commission and we carry 50/100 public liability and property damage insurance on all equipment • Trusting that our proposal bid will meet with your approval and tIUuaking you very kindly for the Invitation to bid, we remain, Yours very truly, S. R* MCKINNEY & SON SM/lm