Information
Details
More Info
Transcription
Cost of Reproduction N ew 2- Description of Property Including O.H. Less Depreciation Pipe Line Facilities serving Industries along north Main St. and Bonanza Hoad Engineering {2% of #14,849) # 446 Pipe Lines 11,916 # 338 Valves 9,027 Fire Hydrants 632 490 651 521 Track support at pipe crossings 1,650 Total Including Engineering 15,294 11,627 Interest During Construction 918 6 98 Total Pipe Line facilities serving Industries along H, Main St. and Bonanza Road % 16,212 1 12,325 Water Meter Serving Pacific JPrult Express Co.________ Engineering (2$ of #2330) Concrete Box Meter - 4* compound Pipe & Fittings Total Including Engineering Interest During Construction 4 Total for P. F. E. Meter I 76 # 55 363 319 711 569 -1*35.6 936 $ 2,606 # 1,879 ___2 M 112 i 2,762 # 1,991 Mote: Above costs are exclusive of material on hand, going concern value and value o f land and rights of way. Office of Viee President Los Angeles, California May 3* 1951