Information
Details
More Info
Transcription
Estimated coat of laying 12 Inch concrete pipe from intake of iSain Pip# at Reservoir to Big Spring, and erecting Housing over Big Spring, Mb Vegas, iievada. Labor: Pipe Line Excavating for pipe line, 600 yards Laying pipe - 2850 ft* Building trestle, Drayag© - 99 Sons .25 • 12 i 1.00 .iuperintondonce, 10% House Over Spring Placing forms and excavating. Placing Concrete - 00 yards H 4*60 Putting on roof - 3000*BM to 8*00 Drayage - 80 Sons # 1.00 150*00 342*00 35.00 99.00 626.00 62.60 300.00 226.00 24.00 88.00 688.60 Ouperint©ndence, 10% 63.70 700.70 1389.30 Material: ‘ pipe Line Material for trestlo-por detail. 30.81 12” Reinforced concrete pipe-2580 ft # !$ • 60/1648.00 WffiTE Superintendence, 10% 157.88 1736.69 House over spring Form lumber - per 'detail, 63.49 Lumber - as per detail 56.23 Cement - 60 barrels to 2.35 117.50 Gravel - 45 yards it • 50 22.50 "258.^2 Superintendence, 10% 25.87 284.59 2021.28 freight - Los Angeles to Las Vegas, fotal, 1025.00 '4135.88 Nummary Labor - -Material- Freight- 1389.30 2021.£8 1026.00 | 4436.58 uorrec Los Angeles, February 1st, 1911. L.A.Form 30-697
