Information
Details
More Info
Transcription
in the location shown by e yellow line «n Exhibit *A*, dated May 5, i®53, attached hsrefce and by this reference incorporated herein* the followings (a) Approximately 300 I# of 0* oast iron «»t«r ©eat of constructing said water Bains is agreed to be the «f $1*440,00, 3* Said water wains shall ha constructed af I* Class 190 » d 3 east iron pips and shall ha in aeeordanea with Federal specifications WWP 431 type 1. All Joints shall he cement. All fittings shall he new* all hell east iron efual te A M Standard Class 390, All valves shall he double dish* parallel seat hrense mettatings eenferming te A I M standards* net less than 175 lhs«* and all valve hexes shall he ©f east iron ef appropriate sine far eaeh valve* Unless otherwise approved by a duly authorised representative of the company* all pipe* valves and fittings shall he manufactured by the Pacific Mates Cast Iren Pipe Company or Mueller Company, All pipe lines shall he chlorinated in aeeerdanee with A W A specifications, shall he subject to the approval #**e acceptance of State and City Health Authorities, and shall he constructed at an elevation te he designated by a duly authorised representative of the company* hut in no event shall there he lass than 36” of covering over such water mains. All workmanship* material and installation of said water mains shall he subject te the approval and aeeoptaneo of a duly authorised representative ef the company. A - / J 4
