Information
Details
More Info
Transcription
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 CaOS^iXAMIirfTIOH BY MR. Q. Chief Case, have you made any testa at any of these points since April 13? 19^9? A, 8©# air. Q. And had you made frequent testa prior to that time? A. We made one prior to that time with the engineers of the Underwriters in 19^2, and a© more flew tests were made until 19**9. How, we will make another flow teat along this fall. The Underwriters hare promised to hare their engineer hack here — 1*11 say probably In November, and we*11 do this again. q. These tests, 1 understand, were made at 5*00 a.m. A. That*s right, Q, Were you aware of the fact that at that hour, the booster pump# of the Water Company were not in operation? A, We were not aware of it when we went out. We made the flow tests on two separate mornings. One test was made on a Sunday morning. We couldn’t get as much water as our flow tests showed in 19^2. Then we found out that the booster pumps weren’t working. The next morning we endeavored to make the flow test again at 5*00 o’clock. We chose that time on account of the lack of traffic In those areas. We still didn’t get the water. The engineer and myself, in my car, went out to the reservoir to see why we didn’t have water, that had happened— the power had gone off. The man that operate® the plant didn't know his pumps were down wit 11 later. He was called—the pressure was dropping, so we went to his home and there was nobody there. We case back to the old reservoir and there was
