Information
Digital ID
upr000218-323
Permalink
I1/ w.o. 3180. Los Angeles, July 25, 1947* Mr* R* L* Adamson: A t f n Iflr. Im Regardlng measurements of 12" Hushing line at settling basin, Las Ve^is, Work Order 3180, which are as follows 6*7 ft from basin to C/L 45° Elbow* 8.7 ft * Elbow to 12" Valve. 22.1 ft ? Valve to End. ( W.I.Pipe) Spacing of power line poles starting at transformer rack are shown below. 16.0 ft spacing at transformer rack. 105.2 " transformer pole to next pole. 150.4 " between next poles. 150 .8 » " " " the 105.2 ft measurement may be divided 89.9 ft from pole to fence and 15.3 ft fence to transformer pole.