Information
Details
More Info
Transcription
LOS ANGELES & SALT L A O RAILROAD COMPANY DEPRECIATION RESERVE AND ANNUAL DEPRECIATION EXPENSE (USING PRESENT DAY COST AND REVISED SERVICE LIVES U TABLE K <* Present * Estimated Annual Reserve Day Average Service S,L. Requiremen item Cost Age Life Depreciation 12/31/49 TTeaFsJ (Years) IT” Transit® pipe, all sizes #125,845 8.17 50 2,477 20,237 Weitied steel pipe. 84" 8,471 7.00 50 169 1,183 Relnf. concr. pipe 18" 2,748 53.00 50 55 2,090 W.I. pipe 8" 338 3.00 40 3 24 8-10-18" 8,846 7.79 50 45 351 G. I* pipe 4* 4,SOS 5.07 40 113 673 e" 863 5.45 50 17 93 8-10" 10,930 7.68 65 168 1,280 18-36" 410,346 9.26 80 8,129 47,495 V, G. pipe 6" 578 5.00 40 14 48 Wells, drilled 12" & 16" 148,878 8,15 40 3,722 30,334 Wood derrick & weir boxes 10,918 7.17 25 436 3,126 Reservoirs 205,748 8.87 78 2,743 23,508 Settling basins, concrete 33,535 8.55 40 833 7,122 Buildings, cone. 18,742 3*49 50 375 1,509 vt frame 8,897 7.91 40 807 1,637 M.H. end valve boxes, concrete 9,380 10.92 40 233 2,544 Fencing 8,994 15.05 56 237 3,354 Tank, wood on cone, found. @94 7.00 35 26 182 Pooping equipment 57,840 4.88 33-1/3 1,735 . 8,363 Miscellaneous 2,437 5.11 35 70 358 Power Line - Poles 3,544 3.62 40 164 922 Wire 44,107 5.09 . 45 . 980 4,988 Total $T,T5Cr;OT 6.$l> #161,115 1950 Depreciation Expense On 1M9 capital' — #19,976 " 1980 A'a & B*a (Table J) 65 Total fS0,W S Reserve Requirement l6l',Tn THF Eff,r— #181,184
