Information
More Info
Transcription
Attached are forme 607 So*# K-27, 28 and 29, reporting additional mater isle chargeable to this work order* th» Baring* of approximately 8$ ie doe to the cost o f engineering end ooet of eonstruetlng power line with eeop&ny forces, being lw « than estimated. Brillod additional artesian moll Bo. 11* 10* x 740* deep. In ranlnlty o f w»U So. 9 . Constructed 1,200,000 gallon reinforced concrete reserrlor, One 16.6* x 91,6* reinforced concrete settling basin and 10466.1 ft of 24* 6 .1 , Pipe line from reeenrior to setd alang Charleston Bonlerard to Mala Street in Leo Vegas, Serada, Oonetraoted ono 26.0* x 3§«0* Reinforced Concrete end conereto bloote Puny Bouse, One 10* x 14* Concrete block end concrete f l or fire poop house. Installed 2 booster pumps, one fire pump and retired 222$ ft of existing pipe lines end reconstructed 2228 ft pips lines In new location, using 468,4 ft 24* tran sits, 146.2 ft 16* transits, 63.4 ft 16* C.X. Pipe, 219,8 ft 14* transits, 944,4 ft 12* Transits, 37,4 ft 12" M s Pipe and 354,0 ft 12* 8H 6*1, Pipe to soonest m ils Bb*s 9 , 10 and 11 to new reserrlor and sons true tod additional 8*8 ft 24* 6*1. and 65.8 ft 24” transit© pips connection to reserrlor. Constructed 117.7 ft 24* 0*1. and 336.1 f t 24* transit# pipe enter lin t by-pass around reserrlor. Constructed 5571 ft additional power lin e , installed now circuit on present polo line from old existing reserrlor to Power House. Installed $ - 2400 ro lt transformers at Reserrlor at Lao Vegas, Sereda, lorn Commenced 2-7-46 m at Completed 4-50-47. 40 Bata fe ta l anount paid contractor MeBeil Sousing Company under the Contrast 9232823.00., divided between structures and pipe linos as shewn below. Pipe Lines. #88060 Pump louse 8640 Keulraent 1450 lir e Pfcwp muse 2016 Reserrlor 96286 Poms 1225 Bottling Basin 8924 transformer Bat 200 Operating Shpenea 26814 total #232828 the fallowing is a brief euamary of the dirision of expense for the Brians units of work performed under this work order as between Genpsny forest and Contractor* forces.
