> m % BlgHtlBDTIOS MINS Distribution Mains from the Water Treatment Plant consist of: Stabilised Water Main. Zeolite Treated Water Main. Domestic Water Main The stabilised water main from the Water Treatment plant clear well to the distribution system at the Magnesium Plant is 40 inch, welded steel pipe. This pipe was fabricated, coated and laid under the same specifications as those for the booster pressure pipe line. The zeolite treated water main is 10 inch diameter, welded steel and extends from the Zeolite treated water clear well at the Water Treatment Plant to the Boiler Plant in the Magnesium plant area. This pipe is coated in accord aace with American Water Works Association specifications So. 7A. 6-1940. The domestic water main between the housing booster pumps and the domestic water distribution system is 12 inch cast iron bell and spigot pipe with lead joints, e * 6