Information
Details
More Info
Transcription
Estimated cost of constructing spur tr ick at Riverside, California, to serve the Southerland Fruit Company, and also cost of moving two company cottages which are now situated where it is proposed to construct new packing house. .************** ************ labor Material Grading 15.00 1 - 60 lb. Switch 25.00 200.00 Lay 370 ft. track 56.00 Bumping post 20.00 80.00 300 ft* 75 lb. repair rail 120.00 20 - 75 lb* Angle bars 8.00 100 Track bolts 3.00 1000 Track spikes 14.00 420 ft. 60 lb. repair rail 113.40 30 - 60 lb. Angle bars 10.00 3 Sets 60 - 75 lb. Compromise joints 15.00 24 Tie bars 75 lb. 26.45 90 lew 7x8 cross ties 56,70 125 Sedond hand ties 31,25 160 - 60 lb. Harriman tie plates 17.60 180 - 75 lb. " M ” 21.60 Moving 2 cottages 150.00 2 Sewer and water connections 80,00 50.00 Foundations and repairs to skirting 50.00_______15.00 396.00 782.00 Store Expense 37.00 Superintendence and contingencies 10# 39.00 78.00 Total | 435,00 897.00 Con ec 11 0. E. | 384,00 A. & B. § 848.00 ,..los Angeles, California. 'October Third, 1912. %Jp4C* Form 30 no. 767 Total 15.00 225.00 56.00 100. GD 120.00 8.00 3.00 14.00 113.40 10.00 15.00 26.45 56.70 31.25 17.60 21.60 150.00 130.00 __65.00 1178.00 37.00 117.00 1232.00 4
