Information
Details
More Info
Transcription
.8 Valley Water District Power Trans-* Collection and Transmission Facilities of Predecessor Compmainsys ion Lines 'r As at December 31* 1950 Schedule" D=»13|. Item Quantity Appraisal Amount Allocated Cost Poles* 458*9 PCorloes sBaumtat Treated 160 $20,082,00 $13,883,00 10® Crossarms 16790 1,465,00 1,013.00 683.00 '472.00 Insulation: 2400 V* - Top Tie C 807.00 558,00 2400 V. <=> Suspended Type C 239.00 165.09 Telephone C 122,00 84.00 Wire: 4/0 Insulated Copper 10,500 EFT 4,409,00 3,048.00 4/0 Bare Copper 43,641 MFT 15,374.00 10,628.09 # 1 Insulated 31,818 MFT 6,287*00 4,346.00 # 4 Insulated 14,328 MFT 1,915.00 1,324.00 # 9 Bare Iron 40,704 MFT : 1,810.00 1,252.00 Transformers t 5 KVA 2 320,00 221.09 10 KVA 1 256,00 177.00 15 KVA 8 2,704.00 1,869.00 2550 KKVVAA 3 1,388,00 960.00 75 KVA 2 1,557.00 1,076.00 100 KVA 3 3,194.00 2,208.00 1/1 Dry 32 3,198592.,0000 2,737.00 126.00 Capacitators 9 585.00 494.09 Lightning Arrestors 24 499.00 345.00 Guy Wires, etc,-. 15 779.00 539.00 Lead-in Conduit and Wire 1,000,00 691.09 Transformer Pole Hacks 3 1,658,00 1,146,00 FeIendcelru Pdainnegl S fwiotrc h2e4s0,0 Ve,t c.400 A, 3 Phase, 2 2,900,00 2,006.00 Total Paver Transmission Lines $74,174.00 $51,278,00
