Information
Details
More Info
Transcription
5 WATER PRODUCTION FACILITIES TABLE D LOS ANGELES & SALT LAKE RAILROAD COMPANY Fixed Capital Original Cost and Present-Day Cost SUMMARY TOTAL Estimated l/ 12/31/48 12/31/49 12/31/50 Original Cost“ Land 2/ # 75,900 # 75,900 # 75,900 Improvements 738,165 779,254 789,300 Total # 814,065 # 855,154 # 865,200 Present-Day Cost Land # 75,900 # 75,900 # 75,900 Improvements 1,061,800 1,120,900 1^30,900 Total #1,137,700 #1,196,800 #1,206,800 December 51, 1949 Original Present Item Cost Day Cost Transite pipe, all sizes # 79,886 | 123,844 Welded steel pipe, 24” 5,743 Reinf. concr. pipe, 12” 8,471 1,084 2,742 W. I. pipe 2 ” 250 335 00 So HO & 1 2 ” 1,535 2,246 Cast iron, pipe 4” 3,192 4,502 II 598 863 8? 1,728 2,603 1 0 ” 5,633 8,328 1 2 ” 18,078 24,359 14" 15 22 16 n 35,507 58,725 24” 226,389 322,036 36 ” 3,332 5,204 Vitrified clay pipe 6” 426 572 Wells, drilled 2 - 12" 13,406 19,680 9 - 16" 99,512 129,198 Derrick & weir boxes 6,076 10,912 Reservoirs 1 - 2,500,000 gal. 47,534) 205'748 1 - 1 ,200,000 gal. 97,572) Settling basins 21,674 33,335 Buildings - concrete 15,204 18,742 frame 4,440 8,297 Manholes & valve boxes 5,078 9,320 Fencing 6,089 8,994 Tank, wood on concr. found • 511 894 Pumping equipment 46,393 57,840 Miscellaneous 1,801 2,437 Power Line - Poles 4,615 6,544 Wire 25,955 44,107 Total 1779,254 fl ,T20,900 Land 75,900 75,900 Total, incl. Land #855,154 #1,196,800 1/ With land at present-day cost. 2/ Includes 679.42 acres of production land and also pipe line and pole line rights of way.
