Information
Details
More Info
Transcription
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 m M m m pip® line into the stain extending along Bonanza Read* la the event the District shall fail to remove the wire lines referred to in subparagraphs (©} and (d) of this section within the period above nasmfciGned, the Railroad Companies shall have the right to remove said wire lines and to construct, or arrange with the SOUTHERN NEVADA POWER COMPANY for the construction of, new con* neetions between the existing power facilities of the District and the power lines of the Southern Nevada Power Company $ a© as to pro* vide power for the operation of the water production facilities located upon the land shown tinted in pink on Exhibit ,!A!\ She Railroad Companies shall have the right to construct such facilities upon the property of the District as shall be necessary to connect said new pipe line and new power line connections into the existing facilities of the District. Upon the completion of said work the District shall pay to- the Railroad Companies within thirty (30) days after rendition of bill therefor, the actual cost to Railroad Companies and the Southern Nevada Rower Company of removing said pip® lines and wire lime and somtrueting said new pipe line and said new power line connections plus tea percent (10$) of said actual coat of construction representing, the cost of supervision. 33.
