Information
Digital ID
upr000287-191
Permalink
13. Description of proposed works__Water wi.3.1 be di-vert ed.... hy-~d Drilled well and distributed through a system of Iron pipe lines. 14. 15. Estimated cost of works__$10,000. Estimated time required to construct the works is__ 2 years LOS ANGELES & SALT LAKE RAILROAD CO, Applicant By Signed (Calvin M, Gory) General Attorney OF STATE ENGINEER (
