Information
Details
More Info
Transcription
'i (b) t© construct. & 24-inch pipe la the location shown In broken re# an# white line between points sterke# I end S ©a Exhibit '*#* an# an S-inch pipe line in location shown in broken re# an# white lines be* tween points narks#? an# 8 on Exhibit *A% it being understood that unless the parties ©an agree on the type of said 24-inch an# £-lnch pipe lines within ninety (90) days after such written notice, Union Pacific shall construct such pipe lines pursuant to good engineering practice and of the approximate capacity hereinabove mentioned; (c) to relocate the pumping station now located at point HI to a sew location shown in soli# green square on Exhibit **A* near point S* (#) When the sai# new pipe lines have been constructed and the said pumping station relocated as provided in subparagraphs (a), (b) and (c) hereof, Union Pacific shall have the right to connect the said pipe lines with the existing transmission fa- ? cilities of the District so as to render unnecessary the use of the pipe lines shown by broken black and red lines between points marked A and I, A and % and 1 and HH* When said new pipe lines shall have . been connected into the transmission system of the District, the Union Pacific shall have the right to disconnect from said transmission system and to remove the said pipe lines shown by broken black and red lines between points marked A and K, 4 and I , and i and Ml, Union Pacific shall credit the salvage value, if any, of the material removed, less the cost of disposing of the same, 5.
