Search the Special Collections and Archives Portal

upr000067 208

Information

Digital ID
upr000067-208
    Details
    Rights
    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.
    Digital Provenance
    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room
    Publisher
    University of Nevada, Las Vegas. Libraries

    'i (b) t© construct. & 24-inch pipe la the location shown In broken re# an# white line between points sterke# I end S ©a Exhibit '*#* an# an S-inch pipe line in location shown in broken re# an# white lines be* tween points narks#? an# 8 on Exhibit *A% it being understood that unless the parties ©an agree on the type of said 24-inch an# £-lnch pipe lines within ninety (90) days after such written notice, Union Pacific shall construct such pipe lines pursuant to good engineering practice and of the approximate ca­pacity hereinabove mentioned; (c) to relocate the pumping station now locat­ed at point HI to a sew location shown in soli# green square on Exhibit **A* near point S* (#) When the sai# new pipe lines have been con­structed and the said pumping station relocated as provided in subparagraphs (a), (b) and (c) hereof, Union Pacific shall have the right to connect the said pipe lines with the existing transmission fa- ? cilities of the District so as to render unneces­sary the use of the pipe lines shown by broken black and red lines between points marked A and I, A and % and 1 and HH* When said new pipe lines shall have . been connected into the transmission system of the District, the Union Pacific shall have the right to disconnect from said transmission system and to re­move the said pipe lines shown by broken black and red lines between points marked A and K, 4 and I , and i and Ml, Union Pacific shall credit the salvage value, if any, of the material removed, less the cost of disposing of the same, 5.