Search the Special Collections and Archives Portal

upr000204 166

Information

Digital ID
upr000204-166
    Details
    Rights
    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.
    Digital Provenance
    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room
    Publisher
    University of Nevada, Las Vegas. Libraries

    ^ / r - Estimated Cost to drill Stand-by Well 800* deep and provide pump* pump house and necessary poser facili­ties, fittings and pipe lines in vicinity of Shop Well, at Las Vegas, Nevada* Well - 800* deep Drill veil using 0 ga» 16* easing, Develop and Test, C o n t in g e n c ie s , Total Well $16,620 ^ 1,500 1*780 $19,600 1 Pump. B*J* #1KH w/60 HP motor, 500 6PM, 285* head* Pump - 10* - 8 Stage Turbine* 140 drasdovn 165* pump setting, Panel - 50 H.P., 440 V w/?ime Delay C ontlngencles Total for Pump & Panel, Pump House, 10x12, inel* electrical work, Poser lines and Transformers, Valvas and Fittings, Pipe Lines, \| Total Estimated Coat, 8,660 275 *" 595 V $ 4,580 1,070 1.000 r 1.000 r 1,000r $28,000 v 0/18/52. S u *