Information
Details
More Info
Transcription
LOS ANGELES & SALT LAKE RAILROAD COMPANY W.O. 1813. Drilled 2 wells Nos. 5 and 6, depth 4-92 ft. and 500 ft. respectively, with furnishings and well easings. Constructed 2 high wooden derreeks 12”xl2"x35" on concrete foundation. Constructed 12”x20” concrete mats at each well. Constructed necessary pipe lines from new wells to connect with existing lines. Installed 2 Byron Jackson deep well suhmergeable turbine pumps complete with 440V 3-phase 60 cycle 4-0 HP motors. Installed power line with transformers and constructed circuit and installed telemeter. Replaced 954- ft. of 24-” wood stave pipe line and fittings with 954 ft. of 24" welded steel pipe and fittings from settling basin to reservoir. Detail of Charges Operating Pipe - size and kind: 174’ of 12” transite pipe 440* of 10" 0,1. ” 15* of 10" W.I. ” 44t of 8” Std.steel " 281346..0604 5563..2609 Investment 1 160.53 Expenses Steel pipe replacing wood stave pipe: 954* of 24” welded steel pipe 3 663.36 Cost at current prices of 954’ of wood stave pipe and fittings, ineluding percentages 2 700.00 2 700.00 Well easings: 570’ of 13-3/8" casing, steel 1 472» Cuotft i1n0g- 31/ 44” 0 ft" . length” Perforating and threading 2 Baker float shoes 681.62 855.01 33.65 230105..9931 3 087.12 Fittings and Miscellaneous Material: 4 C.I. Bends 10” 12.10 48.40 1 12x12x10° Cl Wye branch 43.12 2 Reducers 13-3/8°to 12” 70.66 1 C.I. Std. screw cross 12" 14.50 1 Std. Bull plug 12” 14.69 4 Swedge nipples 10x12” 13.93 55.72 1 Nipple 12-3/4x16" 1.78 1 C.I. screw cross 12” 41*33 4 Steel nipples 8x12” 3.62 14*48 4 Wedge gate flange 8" 24.27 97.08 1 C.I. sleeve 12" 12.59 1 C.I. 12x12x12” Hub Wye branch 52.11 500 Sacks oil well cement 237.25 70 Carriage bolts 5/8x12” .07 4*90 3664 ”” ”" f|xx43"a " *.0022 1..2782
