Information
Details
More Info
Transcription
\ I tem w Un i t (2) No. of Units Average 6« CM. - LR 90° Bend, FI. w/2 figs, bolted os £* Waive fl. w/2 FI. bltd.on 6* W.X. 90° Bend, Fl. Electrical Equipment: CR-1034 (Six) starting compensator, 100 BP, 440W, GE w/PB Stop, Reset Relay Sq.D Safety Sw.. 200-A 90 BP • • ? * 600A-575 AO ?. Sq.D Multi-Breaker, 11J5W-20 A Sq.D.Pumping Plant Panel Glass $940,Type KB-13,44ov, 50 HP Vise, wiring A conduit Pole line to Fire pump switch on pole at fence gate: 3 - #2 wire on 2-35* poles Weatherproof switch Fire Extinguisher (Sno-Fog) Mod. 20 AS, Lever type Total Pump Bouse Ho. 1 Bonanza Village Pump House IP 1 x 24 * Cinder block walls, cone.foundation A floor, comp, roof, steel sash, elec.lights A power, per Dwg.l6l97-*1 to 5> in el. Year Con- Age structed (Yrs) (3) (4) (5) Ea 1 1944 a 1 • 1 • Ea 2 1944 R 2 a a 1 a a 1 a • 1 a Lot a LF 211 1944 Ea 1 a Ea 1 1944 3F 3«4 1949 CY 9 a a 1$.P a Excavation Concrete, Incl.steel 15- ESTIMATED COST COST OF REPRODUCTION Est, Un i t New New * L i f e Cond. Pr i ce Wi thout % Including Less (Yrs) % $ Overhead OH Overhead Depreci ati on (6) (?) (8) (9) (10) (ID (12)
