Search the Special Collections and Archives Portal

Renaissance Center III: Cellular One Building: Civil Drawings, 1987 May; 1992 August 14

Level of Description
File
Scope and Contents

This set includes: grading plans, utility plans, water and sewer plans, index sheet, exterior elevations, finish/door/window schedules, general specifications, floor plans, roof plans, reflected ceiling plans, interior elevations, foundation plans, framing plans, building sections, lighting plans, fixture schedules, HVAC plans, plumbing plans, electrical plans, electrical schedules, construction details and site plans.

This set includes drawings for Vista Group, Inc (client) by Summit Engineering Corporation (engineer).

Date
1987 May; 1992 August 14
Extent
26 Sheets Blue-line prints
Creator/Contributor Links
Container
To request this item in person:
Collection Number: MS-00439
Collection Name: Gary Guy Wilson Architectural Drawings
Box/Folder: Roll 370
General

9369204

Flamingo and Pecos (Clark County, Nevada)

English