Search the Special Collections and Archives Portal

upr000018 170

Information

Digital ID
upr000018-170
    Details
    Member of
    Rights
    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.
    Digital Provenance
    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room
    Publisher
    University of Nevada, Las Vegas. Libraries

    % San P edro, E. G. TILTON, OHIEF ENGINEER Los Angeles & Salt Lake Railroad C ompany Rate on gravel, Las Vegas Employes' cottages, etc. Mr. J. Ross Clark, 1911. 521. Second Vice-President, Building. Dear Sir:- I Lave received from you a copy of a letter you wrote Mr. R. E. Wells respecting the rate to he charged for hauling gravel to he used in construction of employes' cottages, which rate you name as one cent a ton a mile, or about #24.00 a car from Hoya gravel pit to Las Yegas. I took this matter up some weeks ago when preparing cost estimates for the employes' cottages and other buildings at Las Yegas, and Mr. Clark verbally fixed a price of ten dollars a car, including yard switching and return of empties. Mr. Bettis was present at the interview and heard all that passed. Later, I received a letter from Mr. Clark under date of January 20th. 1911, in which he stated the rate would be #13.60 a car. Now,all my estimates were based on the ten dollar rate, and if a higher rate is charged my estimates are too low for whatever structures gravel was to be used in for concrete. I submit that this is most unfair to me, and also that the rate of ten dollars a car is ample as the loads are hauled by freights which reach the gravel pit with less than their tonnage, and in consequence the cost of hauling is probably much less than ten dollars a car