Information
Details
More Info
Transcription
2 - All minerals and all mineral rights, including oil and gas and rights thereto, without right of entry; 5 - Said Grantee, at its sole cost, to install a sewer line; said easement also being subject to all valid existing contracts, leases, liens or encumbrances which may affect said property; consideration $32.20; be, and the same is hereby, ratified, approved and confirmed. On motion duly seconded, it was RESOLVED, that the action of Vice President Reinhardt in executing letter agreement ’’N^L.D. 2630, dated November 22, 1952, with Longley Construction Co., Inc., covering the construction and laying of approximately 3160 feet of 6n cast iron water mains, to serve Moss Tract No. 3, Las Vegas, Nevada; consideration $4,100.00, plus' actual cost of premium on surety bond; be, and the same is hereby, ratified, approved and confirmed. On motion duly seconded, it was RESOLVED, that the action of Vice President Reinhardt in executing letter agreement ”N nL.D. 2636, dated December 6, 1952, with Longley Construction Co., Inc., covering construction and laying of approximately 3570 feet of 6” and 8” cast iron water pipe to serve Blocks 2, 6 and 7 of Tract No. 1 and Block 6 of Tract No. 2, Boulder Dam Homesites Addition, Las Vegas, Nevada; consideration $7,525.00, plus actual cost of premium on surety bond; be, and the same is hereby, ratified, approved and confirmed. On motion duly seconded, it was 5-
