Search the Special Collections and Archives Portal

upr000218 323

Information

Digital ID
upr000218-323
    Details
    Rights
    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.
    Digital Provenance
    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room
    Publisher
    University of Nevada, Las Vegas. Libraries

    I1/ w.o. 3180. Los Angeles, July 25, 1947* Mr* R* L* Adamson: A t f n Iflr. Im Regardlng measurements of 12" Hushing line at settling basin, Las Ve^is, Work Order 3180, which are as follows 6*7 ft from basin to C/L 45° Elbow* 8.7 ft * Elbow to 12" Valve. 22.1 ft ? Valve to End. ( W.I.Pipe) Spacing of power line poles starting at transformer rack are shown below. 16.0 ft spacing at transformer rack. 105.2 " transformer pole to next pole. 150.4 " between next poles. 150 .8 » " " " the 105.2 ft measurement may be divided 89.9 ft from pole to fence and 15.3 ft fence to transformer pole.