Search the Special Collections and Archives Portal

upr000338 48

Information

Digital ID
upr000338-048
    Details
    Rights
    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.
    Digital Provenance
    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room
    Publisher
    University of Nevada, Las Vegas. Libraries

    Work Order 5761-A. completed March 51. 1926 Place 4420 o .y . gravel and 10220 c .y . waste material embankment in replacement o f 517 * fuel o i l tinloading tre s tle and construct o i l chute box ^ M r. R . L . Adamson, Sheet I 0 . 14* I»abor______ Ifattl« T ota l Grading: Embankment-gravel train haul Gonpany c .y . 4420 Contract #1,414*57 #2,659*46 415*59 Bnbankraent-waate material No charge c .y . 10220 O il chute Box Lumber O.P. M.B.M. .400 Hardware cwt. .10 Ledger value o f fu e l o i l unloading box retained in place and reused Lumber O.P. M.B.M. 7.748 Hardware cwt. 2*50 55.60 17.45 •45 155.00 164.00 ______ . 20.00 #4,856*12 (19) NOTH: The 10,220 c .y . o f waste material was obtained from shops and yard, 7500 c .y . placed p rior to 1920 and 2720 c .y . placed since 1920. A ll charges for placing were charged to Operating Expenses. Work Order 659. completed August 51. 1926 in s ta ll 546.1 f t . drain lin e from sump at o i l delivery tank to 12* round house sewer lin e Excavation N.G. c .y . 50 B ackfill c .y . 50 S.H. b oile r flues including fit t in g s , e to . l i n . f t . 546.1 #102.06 # 3*07 16.48 .49 51.57 11.07 # 184.74 (19) Total ledger value fuel o il fa c ilit ie s * #25.194*56 (9) Yard Track #29 - Fuel Oil Unloading Spur That portion o f track #29 from S ig. sta . 4+55.6 to the end o f track #29, 758.0 t r . f t . , and including the turnout of track #55, is necessary to unload fu el o i l . Fuel o il is used in producing power and ledger value o f the trackage is therefore, included in this study. Changes in the length o f this portion o f track #29 have been made since date o f valuation without any adjustment being made in Capital Account and quantities inventoried by the I . C. C. have therefore been used in producing this ledger value. Original Construction, caliente to B rie, 1903 to 1906 Construction 65 f t . o f 60# trackage, including turnout, and 706 f t . o f 75# trackage, including 517 f t . located on tr e s tle .